Categories
Item Number: B3131752
Manufacturer Part ID: 7100148768

Manufacturer: 3M


There are no reviews yet. |
Retail: $48.25
Price: $44.57
You Save: $3.68 (7.6%)

    Purchase with Reward Points:2547

    Quantity:

    3M; Scotch Weld; DP460 Epoxy Adhesive Duo-Pak 50 ml Capacity Off-White

    3M; SCOTCH-WELD; EPOXY ADHESIVE DP460 IS A TOUGHENED TWO-PART EPOXY ADHESIVE WITH A 21 MIX RATIO 60 MINUTE WORK LIFE AND HANDLING STRENGTH IN APPROXIMATELY FOUR HOURS. THIS PRODUCT PROVIDES A STRONG DURABLE BOND TO MANY SURFACES. FEATURES UL STYLE""MARGIN-TOP0PX; PADDING-TOP 5PX; PADDING-BOTTOM 5PX;"" HIGH PEEL AND SHEAR STRENGTH FOR STRONG BONDS IN CRITICAL APPLICATIONS OUR 3M; SCOTCH-WELD; EPOXY ADHESIVE DP460 EXHIBITS EXCELLENT SHEAR AND PEEL STRENGTH ALONG WITH GOOD IMPACT DURABILITY. IT BONDS TO MANY SURFACES SUCH AS CERAMICS METALS GLASS WOOD AND SOME PLASTICS. WHEN IT COMES TO PREPARATION AND APPLICATION 3M; SCOTCH-WELD; EPOXY ADHESIVE DP460 IS STRAIGHTFORWARD AND EASY-TO-USE. SIMPLY MIX THE COMPONENTS WITH A 21 BY VOLUME MIX RATIO AND THEN APPLY ACCORDING TO THE INSTRUCTIONS TO ACHIEVE A STRONG LONG-LASTING BOND. THE COMPONENTS ARE EASY TO MIX AND THE 60 MINUTE WORK LIFE MEANS USERS HAVE AMPLE TIME TO RE-POSITION THE BONDING SURFACES BEFORE A DURABLE LONG-LASTING BOND IS ACHIEVED. FOR EASIER MIXING AND APPLICATION USE 3M; SCOTCH-WELD; EPX; PLUS II APPLICATORS WITH A DUO-PAK CARTRIDGE 60 MINUTE WORK LIFE WITH HANDLING STRENGTH IN FOUR HOURS ALLOWS SUFFICIENT TIME FOR RE-POSITIONING TOUGHENED FOR IMPACT RESISTANCE AND HIGH FATIGUE RESISTANCE TO WITHSTAND DEMANDING CONDITIONS OUTSTANDING ENVIRONMENTAL PERFORMANCE UL-HB CERTIFIED ASTM E162 ASTM E662 BOMBARDIER SMP 800C BOEING BSS 7239 RECOMMENDED APPLICATIONS UL STYLE""MARGIN-TOP0PX; PADDING-TOP 5PX; PADDING-BOTTOM 5PX;"" HIGH IMPACT RESISTANCE FOR SPORTING GOODS TRANSPORTATION APPLICATIONS SUCH AS RAIL AND AUTOMOTIVE MILITARY AND AEROSPACE APPLICATIONS HIGH TEMPERATURE RESISTANCE APPLICATIONS

    Priced: Each

    Minimum for Order: 12

    Manufacturer Dropship Typical Leadtime: 2.0